Rodong Sinmun
Rodong Sinmun
Feb. 14, 2025 Friday

Overhauling of Waterways in Final Stage


Officials and shock brigade members of the division for waterway construction push ahead with the overhauling of Kaechon-Lake Thaesong and Phyongnam Irrigation waterways in the final stage.

The commanding team of the division for waterway construction sees to it that the members of the construction panel enhance their roles to ensure quality and speed of the construction while giving precedence to supply of materials.

Mindful that arousing masses’ mental power to maximum is the key to creation of miracles, the officials of the division briskly conduct field political work and find themselves earlier than others in the most difficult jobs in every workplace to arouse the shock brigade members to the projects.

The Pyongyang municipal brigade and other brigades take positive steps to thoroughly implement the program according to the winter condition.

Rodong Sinmun



      
       49 / 572